London Stansted Airport
Providing ongoing Principal Designer, CDM and Health & Safety support for complex construction and civil engineering works within the live operational environment of London Stansted Airport.
Project Overview
AM Safety Specialists Ltd provided Principal Designer, CDM and Health & Safety support for construction and civil engineering activities undertaken within the live operational environment of London Stansted Airport.
The work includes supporting major infrastructure and utility projects, including the Stansted Transformation Project and associated service diversions. Activities include drainage, potable water diversions, electrical and communications ducting, excavations, concrete works, pits and chambers, pavement and asphalt reinstatement, testing and handover.
Working within a major international airport creates additional challenges including live and buried services, airside and landside interfaces, security requirements, vehicle and pedestrian movements, restricted work areas and coordination with multiple contractors.
Our Involvement
Our role combines Principal Designer/CDM responsibilities with practical on-site Health & Safety support, including:
- Principal Designer and CDM 2015 advice and coordination.
- Review of design information, surveys and significant design risks.
- Preparation and review of Pre-Construction Information and Construction Phase Plans.
- RAMS, safe systems of work, permits and contractor competency reviews.
- Health & Safety inspections, audits and corrective-action reporting.
- Support for excavations, temporary works, confined spaces, lifting operations, work at height and live services.
- Airside vehicle, plant and traffic-management controls.
- Ongoing advice to project managers, supervisors and site teams.
- Supporting the progressive compilation of project records and Health & Safety File information.
Challenges and Solutions
A key challenge is ensuring construction work can progress safely without adversely affecting the operation of a busy international airport.
Our approach combines design-stage risk management with regular site inspections and practical engagement with project teams. This enables issues involving RAMS, permits, temporary works, excavations, traffic management, competency and contractor coordination to be identified early and addressed effectively.
Project-specific controls have also been developed to link construction activities with approved drawings, specifications, RAMS and Inspection and Test Plans, including appropriate hold, witness and review points.
Results and Outcomes
Our involvement has helped establish structured and practical CDM and Health & Safety arrangements across complex airport works, including:
- Improved CDM 2015 compliance and coordination.
- Project-specific Construction Phase Planning.
- Regular site inspection and corrective-action processes.
- Improved management of high-risk construction activities.
- Better coordination between contractors and project stakeholders.
- Support for ISO 9001, ISO 14001 and ISO 45001 management-system arrangements.
- Improved collection of inspection, testing and handover information.
Project Highlight
The project demonstrates our ability to combine Principal Designer expertise with hands-on Health & Safety support in a highly controlled operational environment, helping contractors manage complex construction risks while maintaining safe and efficient airport operations.