Future Olympia Redevelopment
Providing regular Health & Safety inspections and practical site support throughout the façade package at the £1.3 billion Future Olympia redevelopment in London.
Project Overview
AM Safety Specialists Ltd provided Health & Safety consultancy and regular site inspections in connection with specialist façade works forming part of the major Future Olympia redevelopment.
Our involvement focused on monitoring working practices, site conditions and the management arrangements supporting the façade package. Formal inspections were undertaken throughout the works, identifying good practice alongside areas requiring improvement and providing clear actions for the site management team.
The façade works presented a range of construction risks, particularly around work at height, access equipment, lifting activities, installation works and coordination within a large, complex construction environment.
Our Involvement
Our Health & Safety support included:
- Regular site Health & Safety inspections.
- Formal inspection reports and corrective-action tracking.
- Review of RAMS and statutory Health & Safety documentation.
- Monitoring workforce inductions, training and competency.
- Review of working-at-height arrangements.
- Inspection of scaffolding, mobile towers and working platforms.
- Monitoring MEWP and scissor-lift operations.
- Review of edge protection and access arrangements.
- Monitoring lifting operations and exclusion zones.
- PPE and general site-safety monitoring.
- Housekeeping and material-storage inspections.
- Review of equipment inspections and relevant site records.
- Follow-up of actions with site management through to close-out
Challenges and Solutions
The specialist façade package involved working at height and the movement and installation of façade components within a busy major construction project.
Our inspections provided an independent review of how these risks were being controlled in practice. Particular attention was given to access equipment, working platforms, edge protection, lifting activities and exclusion zones, alongside the workforce's adherence to RAMS and site procedures.
Where issues were identified, clear corrective actions were raised with the site management team. Follow-up evidence was reviewed where appropriate to confirm that improvements had been implemented. This included an identified manual-handling issue which resulted in additional workforce instruction being delivered and the action subsequently being closed.
Results and Outcomes
Our involvement supported the façade team in maintaining structured Health & Safety arrangements throughout the works, including:
- Regular independent monitoring of site conditions.
- Identification and communication of improvement opportunities.
- Improved management of work-at-height risks.
- Monitoring of lifting, access and exclusion arrangements.
- Verification of training, competency and inspection records.
- Recognition and reinforcement of good working practices.
- Formal tracking and close-out of Health & Safety actions.
- Practical support to site management as works progressed.
Inspection records also recognised positive standards, including housekeeping, material storage, PPE, edge protection and controlled access arrangements.
Project Highlight
The project demonstrates AM Safety Specialists’ ability to provide practical, independent Health & Safety support for specialist packages on major construction projects.
Through regular site attendance, structured reporting and direct engagement with the site team, we helped ensure that documented Health & Safety arrangements translated into effective working practices during the delivery of complex façade works at the £1.3 billion Future Olympia redevelopment
Interested in this project?
Get in touch with us to discuss similar project scope requirements.